Construction Contracts in Ontario: Key Terms to Know

Walks through what a solid construction contract should cover — scope, price and payment schedule, change orders, holdback, substantial performance, warranty and dispute resolution — and how CCDC standard forms fit in.

FreeConsultation Available
BA, JDSite Managed by Ryan Manilla
15+ yrsAt Ontario Bar
Published February 1, 2027Updated February 1, 2027Legally reviewed by Ryan J. Manilla, BA, JD

Key Takeaways

  • A construction contract should spell out scope of work, price, payment schedule, change orders, holdback, completion, warranty, and dispute resolution — gaps in any of these tend to surface later as disputes.
  • “Scope of work” is the single most argued-over phrase on a job site, so vague or incomplete descriptions create risk for everyone involved.
  • Ontario’s Construction Act requires a 10% holdback on most projects, and a contract can’t contract out of that minimum.
  • A written change order process protects both the owner (from scope creep) and the contractor (from doing extra work for free).
  • Standard form contracts, like those published by the Canadian Construction Documents Committee (CCDC), are a common reference point, though many Ontario projects use custom or modified agreements instead.
  • A contract’s dispute resolution clause — mediation, adjudication, or arbitration — often determines how quickly and cheaply a disagreement actually gets resolved.

Why the contract matters

A construction project involves a lot of moving pieces — trades, materials, schedules, money, and often multiple layers of contractors and subcontractors. The written contract is what ties all of that together, and it’s usually the first document everyone turns to once something goes wrong. A contract that clearly addresses the issues below doesn’t guarantee a smooth project, but it gives both the owner and the contractor a shared, written reference point instead of relying on memory or assumptions.

This article gives a general overview of what a solid construction contract in Ontario typically covers. It’s general information about how these agreements generally work, not a template or a substitute for reviewing the actual terms of a specific contract.

Scope of work, price, and payment schedule

Scope of work. This is the description of exactly what the contractor is agreeing to do — and, often more importantly, what’s excluded. Vague scope language (“renovate the kitchen”) tends to generate disputes once work begins, because the owner and contractor may have pictured different things. A clear scope usually references drawings, specifications, or an itemized list of inclusions and exclusions, so there’s a concrete record of what the price was actually based on.

Price and payment schedule. Construction contracts are generally priced either as a fixed lump sum for the defined scope, or on a cost-plus basis where the owner pays actual costs plus a fee. Either way, the payment schedule matters as much as the total price — most contracts break payment into milestones tied to progress (for example, a deposit, progress payments as phases complete, and a final payment on substantial performance), rather than paying the full amount upfront or only at the very end.

A payment schedule tied to defined milestones also gives both sides a shared way to measure progress — the owner can see, at each payment, roughly what has actually been completed, and the contractor has more predictable cash flow instead of waiting until the very end of the job to be paid for most of the work. Disputes often arise when a milestone is described loosely (“rough-in complete”) without a shared understanding of what that actually means, so more detailed contracts tend to define each milestone with reasonable precision and attach it to a specific dollar amount or percentage of the contract price.

Worth knowing

Ontario’s Construction Act now imposes mandatory timelines for paying proper invoices on many projects, a regime generally referred to as prompt payment. It operates alongside whatever payment schedule the contract sets out, not instead of it.

The change order process

Almost no project runs exactly as originally planned — owners request upgrades, site conditions reveal surprises, or materials become unavailable and need substituting. A change order is the mechanism contracts use to document these adjustments: what’s changing, the cost or credit involved, and any effect on the schedule.

A well-drafted contract generally requires change orders to be agreed in writing before the additional work proceeds. This protects the owner from unauthorized scope creep and protects the contractor from doing extra work without being paid for it. Our article on change orders in Ontario construction contracts goes into more depth on how this process typically works and what tends to go wrong when it’s skipped.

Beyond cost, a change order should also note any effect on the completion date. A project delayed by owner-requested changes is generally treated differently, for scheduling purposes, than one delayed by the contractor’s own performance issues, and a contract that’s silent on this point can leave both sides guessing about who’s responsible for a delay once the original target date has passed.

Holdback and completion

Ontario’s Construction Act requires owners to hold back 10% of the contract price from payments made to the contractor, generally in order to fund potential lien claims by unpaid subcontractors, suppliers, or workers further down the chain. This holdback requirement applies regardless of what the contract says — it’s a statutory floor, not a negotiable term. Our dedicated article on holdback requirements under the Construction Act covers when and how holdback is released in more detail.

Completion is usually tied to the concept of substantial performance, a defined point under the Construction Act where the project (or most of it) is ready for use, even if minor deficiencies remain. Publishing a certificate of substantial performance is significant because it starts the clock on certain lien deadlines — see our article on the certificate of substantial performance for how that process works.

Warranty terms

Most construction contracts include a warranty period during which the contractor remains responsible for fixing defects in workmanship or materials — commonly one year from substantial performance or completion, though this varies by contract. The warranty clause should spell out what’s covered, how a deficiency claim is made, and any limitations or exclusions (normal wear and tear, owner-caused damage, and so on).

For new residential construction, Tarion warranty coverage can also apply on top of the contract’s own warranty terms, adding a separate layer of protection specific to new homes. Deficiencies that surface after a project wraps up are covered in more depth in our article on construction deficiency claims.

It’s worth distinguishing a warranty clause from a deficiency claim made during the project itself. A warranty generally applies after the work is considered complete, covering problems that surface later, while deficiencies identified before completion are typically addressed through the ordinary course of finishing the job — sometimes with a portion of payment held back specifically until an identified deficiency is corrected.

Standard form contracts as a reference point

Many Ontario construction projects use, or start from, a standard form contract rather than drafting an agreement from scratch. The best-known examples are published by the Canadian Construction Documents Committee (CCDC), a national body whose documents are widely used as a general reference point for allocating risk, defining key terms, and structuring payment and change processes across the industry.

Standard forms aren’t mandatory, and it’s common for parties to modify them with supplementary conditions suited to a specific project, or to use an entirely custom agreement, particularly for smaller residential jobs. What matters more than which template is used is whether the final, signed document actually addresses the core issues — scope, price, changes, holdback, completion, warranty, and dispute resolution — clearly enough to be useful if a disagreement comes up later.

This article doesn’t reproduce the text of any standard form contract, and nothing here should be read as a summary of a specific CCDC document’s actual terms. Anyone working from a standard form contract should read the particular edition and any supplementary conditions attached to it, since terms can and do vary between editions and between projects.

Dispute resolution clauses

Finally, many construction contracts specify, in advance, how disagreements will be handled — whether through negotiation, mediation, the Construction Act’s interim adjudication process, arbitration, or court. Knowing which path applies before a dispute happens tends to make resolution faster, since the parties aren’t also arguing about process on top of substance.

Disputes between homeowners and contractors are common enough on smaller residential projects that they’re covered separately in our article on homeowner-contractor disputes. For a broader look at the construction hub, including liens, bonds, and subcontractor agreements, see the construction insights hub, or our tools and checklists for practical reference material. This is general information about how construction contracts generally work in Ontario, not legal advice about a specific agreement — if you have questions about a contract you’re about to sign, reviewing the actual document closely matters more than any general summary.

Legally reviewed by Ryan J. Manilla, BA, JDGeneral legal information, not personalized legal advice.Read our review policy →

More in Construction

Continue reading

Construction

Construction Liens in Ontario: How They Work and Filing Deadlines

What a construction lien secures, who can claim one, Ontario’s 60-day preservation and 90-day perfection deadlines, and what registering a lien does to title.

February 2, 2027
Construction

Holdback Requirements Under Ontario’s Construction Act

Covers the mandatory 10% holdback, why it exists, basic versus finishing holdback, when it becomes releasable, and annual or phased release on longer projects.

February 3, 2027
Construction

Prompt Payment Rules in Ontario Construction Contracts

Covers the proper invoice requirement, the cascading 28-day and 7-day payment timelines, notices of non-payment, and how the regime is meant to keep money flowing down the payment chain.

February 4, 2027
Construction

Interim Adjudication for Ontario Construction Disputes

Explains the fast interim adjudication process under the Construction Act — which disputes qualify, how notice and appointment work, the 30-day decision timeline, and how it differs from mediation, arbitration and litigation.

February 5, 2027
Construction

Home Renovation Contracts in Ontario: What to Include

Key terms every homeowner-renovator contract should cover — scope, pricing, milestone-based payment, permits, change orders, cleanup and warranty — plus red flags to watch for.

February 6, 2027
Construction

Subcontractor Agreements in Ontario

What a general contractor–subcontractor agreement should cover, including pay-when-paid versus pay-if-paid clauses, prompt payment, insurance and indemnities, and the lien rights subcontractors keep regardless of contract wording.

February 7, 2027
Construction

Construction Deficiency Claims in Ontario

How to tell a deficiency from normal wear, document it properly, use holdback as leverage, and the options available when a contractor won’t fix defective work.

February 8, 2027
Construction

Substantial Performance in Ontario Construction Projects

What substantial performance means under the Construction Act, how it’s determined, and why publishing a certificate starts lien deadlines and can trigger holdback release.

February 9, 2027
Construction

Change Orders in Ontario Construction Contracts

Explains why scope changes need a written change order rather than a verbal instruction, covering price, schedule and holdback impacts, the typical approval process, and the risks unrecorded extras create for owners and contractors alike.

February 10, 2027
Construction

Performance and Labour & Material Bonds in Ontario

Breaks down what a performance bond protects versus a labour and material payment bond, when bonding is typically required, and how a bond claim against the surety generally proceeds.

February 11, 2027
Construction

Discharging or Vacating a Construction Lien in Ontario

Walks through an owner’s options when facing a registered lien — paying it out, negotiating a holdback-based arrangement, or posting security to vacate the lien from title — plus what happens when a claimant misses the Construction Act’s deadlines.

February 12, 2027
Construction

Homeowner vs. Contractor Disputes in Ontario

Covers common flashpoints such as incomplete work, overruns, delays and quality, practical first steps, holdback and lien dynamics from the homeowner’s side, and escalation through Small Claims or Superior Court.

February 13, 2027

FAQ

Frequently asked questions

What should be included in a construction contract in Ontario?+

At minimum, a solid construction contract covers the scope of work, the contract price and payment schedule, the process for approving change orders, holdback obligations under the Construction Act, the target completion date and definition of substantial performance, warranty terms, and how disputes will be resolved. Missing or vague terms in any of these areas is a common source of later disagreements.

Do I need a written contract for a construction project in Ontario?+

Ontario law doesn’t generally require every construction agreement to be in writing, and verbal agreements can be enforceable. In practice, though, construction projects involve enough moving parts — price, schedule, changes, holdback — that an unwritten agreement makes it much harder to prove what was actually promised if a dispute arises.

What is the Construction Act and does it apply to my project?+

The Construction Act, 2019 is Ontario’s governing legislation for construction projects, covering lien rights, mandatory holdback, and prompt payment and adjudication rules. It generally applies to improvements to real property in Ontario, whether the owner is a homeowner, a business, or a public authority, though some rules apply differently depending on the size and nature of the project.

What is a CCDC contract?+

CCDC stands for the Canadian Construction Documents Committee, which publishes standard form construction contracts used as a reference point across Canada, including in Ontario. They’re not mandatory, and many projects use custom agreements instead, but CCDC documents are a widely recognized starting point for allocating risk and defining common terms.

Can a construction contract waive the holdback requirement?+

No. The 10% holdback required under Ontario’s Construction Act is a statutory minimum, and a contract generally can’t contract out of it. Parties can agree to additional terms around how and when holdback is released, but the underlying obligation to hold back funds isn’t something a contract can simply remove.

What happens if the contract doesn’t clearly define the scope of work?+

A vague scope of work is one of the most common sources of construction disputes, because it leaves room for disagreement about what was actually included in the price. When a dispute arises, parties often end up relying on quotes, drawings, specifications, and email exchanges to reconstruct what was really agreed to.

What is a change order and when is one needed?+

A change order documents an agreed change to the original scope, price, or schedule of a project — for example, adding a feature the owner requests mid-project. Most well-drafted contracts require changes to be documented in writing before the work proceeds, precisely to avoid later disagreements over what was authorized and at what cost.

What does “substantial performance” mean in a construction contract?+

Substantial performance is a defined concept under the Construction Act marking the point where a project (or most of it) is ready for use, even if minor deficiencies remain. Publishing a certificate of substantial performance starts the clock on certain lien preservation deadlines and can affect when holdback becomes releasable.

What warranty am I entitled to on construction work in Ontario?+

Warranty terms vary by contract, but many construction agreements include an express warranty period (commonly one year) during which the contractor is responsible for fixing defects in workmanship or materials. New home construction may also be covered separately by Tarion warranty protections, which operate alongside, not instead of, the construction contract.

Should a construction contract specify how disputes will be resolved?+

Yes. Many construction contracts include a dispute resolution clause specifying mediation, arbitration, or reliance on the Construction Act’s adjudication process before — or instead of — litigation. Knowing which process applies before a dispute happens generally makes resolution faster and less expensive than figuring it out after the fact.

Can I negotiate the terms of a standard form construction contract?+

Generally, yes. Standard form contracts like CCDC documents are designed to be a starting template, with supplementary conditions used to tailor terms to the specific project. Whether particular terms are negotiable in practice often depends on the relative bargaining power of the parties and the size of the project.

What’s the difference between a fixed-price and a cost-plus construction contract?+

A fixed-price (or lump-sum) contract sets a single price for the defined scope of work, putting most cost-overrun risk on the contractor. A cost-plus contract instead bills the owner for actual costs plus a fee or markup, shifting more pricing risk to the owner but offering more flexibility when the scope isn’t fully defined upfront.

Understand your agreement. Know your next step.

Ontario-wide, plain-English contract law information — built to help you make sense of your situation before you decide what to do next.

Free Consultation

Speak with a contract lawyer, free of charge

Tell us briefly what’s going on and we’ll be in touch to set up a free consultation about your contract situation.