Skip to content
Contract Law Ontario

Real Estate

New Home Builder Contracts and Tarion Warranty in Ontario

How buying a new-build differs from a resale, typical builder agreement terms like delayed closing and deposits, and what Tarion’s warranty periods generally cover.

FreeConsultation Available
BA, JDSite Managed by Ryan Manilla
15+ yrsAt Ontario Bar
Published February 20, 2027Updated February 20, 2027Legally reviewed by Ryan J. Manilla, BA, JD

Key Takeaways

  • A new-build purchase in Ontario generally uses the builder’s own agreement form, not the standard resale APS most buyers expect.
  • Delayed closing and occupancy provisions are common in new-build contracts and are usually addressed through compensation rules rather than outright cancellation rights.
  • Deposits on new-build homes are generally protected through Tarion up to statutory limits, separate from how resale deposits are typically held.
  • Tarion’s new home warranty program generally covers defects across one-year, two-year, and seven-year windows, with different items falling into each.
  • Major structural defects are typically covered for up to seven years, while many finishing and workmanship items fall into the shorter one-year window.
  • Making a Tarion claim generally involves submitting a form within specific reporting periods, so missing a window can mean losing coverage for that item.

How a new-build purchase differs from a resale

Buying a brand-new home from a builder in Ontario works differently from buying an existing resale property, starting with the contract itself. Where a resale deal generally uses the standard agreement of purchase and sale form many buyers and agents are familiar with, a new-build purchase is governed by the builder’s own agreement — a document the builder drafts, often lengthy, and generally used for every buyer in that project rather than individually negotiated.

The practical differences flow from the fact that the home may not exist yet, or may be mid-construction. Instead of a fixed closing date, new-build agreements commonly set an occupancy or closing date range, with mechanisms allowing the builder to adjust it as construction progresses. Buyers are often also choosing finishes and upgrades as part of the purchase process, which get documented separately and folded into the final price. And unlike most resale purchases, a new-build home generally comes with statutory warranty protection through Tarion that doesn’t apply to an existing home changing hands.

What’s typically in the builder’s agreement

A builder’s agreement of purchase and sale is generally longer and more detailed than a resale APS, reflecting the number of variables involved in building a home. It typically sets out the purchase price and what it includes, a schedule of standard features and any selected upgrades, the deposit structure (often staged over several payments rather than a single deposit), and detailed provisions addressing delays, extensions, and closing adjustments.

It also commonly includes the builder’s right to make certain changes during construction — substituting materials of similar quality, for instance, or adjusting minor specifications — within limits set by the agreement and by Tarion’s rules. Because builders generally use one form across an entire project, there’s often limited room to negotiate the core structure of the agreement, even though specific items like upgrade pricing or included features can sometimes be discussed before signing.

The agreement also generally addresses what happens if the buyer wants out before closing, or wants to sell their interest in the purchase to someone else before the home is complete. Builder agreements commonly restrict or require consent for an assignment of the agreement, often charging a fee or imposing conditions on the buyer who wants to assign their rights. Reviewing these provisions before signing matters particularly for buyers purchasing a pre-construction unit with a long gap between the agreement date and closing, since circumstances can change considerably over that time.

Delayed closing and occupancy provisions

Construction timelines shift, and new-build agreements are generally built around that reality rather than treating the closing date as fixed the way a resale deal does. Many builder agreements set out an initial occupancy date along with a defined number of permitted extensions the builder can exercise, often with required notice to the buyer for each one.

Beyond what the contract itself allows, Tarion’s warranty program generally layers its own delayed closing and delayed occupancy compensation rules on top, which can entitle a buyer to compensation once delays exceed what’s permitted under the statutory framework. The two systems — the contract’s own extension provisions and Tarion’s compensation rules — generally work together rather than one replacing the other, which is part of why reviewing both the agreement and Tarion’s published bulletins on delayed closings can be worthwhile before relying on an expected move-in date.

Worth knowing

A delay that falls within the builder’s permitted extensions under the agreement isn’t automatically a breach. Whether compensation is owed, and how much, generally depends on the specific extension provisions in the contract and the rules Tarion applies once those are exhausted.

Deposit protection on a new-build purchase

Deposits on a new-build purchase generally work differently from a resale deposit, which is typically held in trust by a brokerage. On a new-build deal, deposits are generally protected through Tarion, up to a statutory maximum set by regulation, rather than simply sitting in a real estate trust account. This protection is specifically designed to address situations where a builder becomes insolvent, abandons a project, or otherwise fails to complete the home as agreed.

Because deposits on larger pre-construction or custom projects can sometimes exceed the statutory protected amount, it’s generally worth understanding what portion of a deposit is actually covered before structuring payments, particularly on higher-priced builds where staged deposits can add up quickly over the course of construction.

What is Tarion and the new home warranty program?

Tarion administers Ontario’s new home warranty program under the Ontario New Home Warranties Plan Act. Every builder constructing new homes for sale in Ontario is generally required to be registered with Tarion, and every new home sold is generally enrolled in the warranty program as part of that process. The program exists to give buyers a baseline level of protection against construction defects that exists independently of what any individual builder’s contract promises.

Rather than a single blanket guarantee, the warranty is structured around different time periods, each covering different categories of potential problems. This structure reflects the reality that some defects — like a workmanship issue with a cabinet — tend to show up quickly, while others — like a structural problem — may not become apparent for years.

Builders generally pay an enrolment fee to Tarion for each new home sold, which funds the warranty program and the claims process. In exchange, buyers generally receive a level of protection that exists regardless of what a particular builder’s own contract promises — meaning a builder generally cannot contract out of the statutory minimum warranty coverage, even if the purchase agreement includes language that tries to limit liability more broadly.

The one-year, two-year, and seven-year warranty periods

The one-year warranty is generally the broadest in day-to-day terms, covering the home against defects in work and materials, unauthorized substitutions, and ensuring the home is fit for habitation and built in accordance with the Ontario Building Code. Many of the issues buyers first notice after moving in — minor cracks, finishing problems, or appliances and fixtures not working as expected — generally fall within this window.

The two-year warranty generally continues to cover items like water penetration through the basement or foundation, defects in the electrical, plumbing, and heating delivery and distribution systems, and violations of the Ontario Building Code affecting health and safety. The seven-year warranty is narrower in scope but longer in duration, generally covering major structural defects — issues serious enough to affect the structural integrity of the home. Each window generally has its own reporting deadlines, and coverage for a given category of issue typically ends once its specific window has closed.

Making a Tarion claim

A Tarion claim generally starts with notifying the builder directly, since many issues are resolved without a formal filing. If that doesn’t resolve the problem, the next step is generally submitting the applicable warranty form to Tarion within the reporting period tied to that item — commonly structured around certain intervals after possession, with a separate process for major structural claims that can arise later within the seven-year window.

Because each warranty period generally has its own reporting deadline, keeping track of when the home was occupied and documenting issues as they’re noticed is generally important — an otherwise valid defect can lose its warranty eligibility if it isn’t reported within the applicable window. For problems that fall outside what Tarion covers, or that raise broader contract or construction issues, it may also be worth understanding how Ontario’s general limitation periods could apply alongside the warranty process. See also our overview of real estate disclosure obligations and visit our tools or contact pages for further resources.

Legally reviewed by Ryan J. Manilla, BA, JDGeneral legal information, not personalized legal advice.Read our review policy →

More in Real Estate

Continue reading

Real Estate

Agreement of Purchase and Sale in Ontario Explained

Explains what an APS is, when it becomes a binding contract, and its core elements — parties, property, price, deposit, closing date, conditions, and included or excluded items.

February 14, 2027
Real Estate

Real Estate Deposits in Ontario: Rules and Risks

Covers how deposits are held in trust rather than paid to the seller, when deposits are forfeited versus returned, and what happens when a deposit release is disputed.

February 15, 2027
Real Estate

Financing, Inspection and Other Conditions in an Ontario APS

Covers financing, home inspection, status certificate and sale-of-existing-home conditions, how conditions are waived, good-faith requirements, and the consequences of a missed deadline.

February 16, 2027
Real Estate

Assigning an Agreement of Purchase and Sale in Ontario

Explains assigning a buyer’s rights before closing, common in pre-construction condos, including builder or seller consent requirements and assignment fees.

February 17, 2027
Real Estate

What Happens If a Buyer or Seller Fails to Close in Ontario?

Covers remedies for the non-breaching party, including damages for a resale shortfall, specific performance, deposit forfeiture, and what happens when a buyer’s financing falls through.

February 18, 2027
Real Estate

Status Certificates in Ontario Condo Purchases

What a status certificate is, why it’s typically made a condition in resale condo deals, and what buyers and their lawyers look for inside one.

February 19, 2027
Real Estate

Real Estate Listing Agreements in Ontario

What a seller’s listing agreement with a brokerage typically covers, including commission, term, holdover periods and exclusivity, under Ontario’s TRESA framework.

February 21, 2027
Real Estate

Title Insurance in Ontario Real Estate Deals

What title insurance protects against, the difference between owner’s and lender’s policies, how it differs from a lawyer’s title search, and when it’s typically purchased at closing.

February 22, 2027
Real Estate

Seller Disclosure Obligations in Ontario Real Estate

Explains Ontario’s buyer-beware starting point for patent defects, the narrow exception for known latent defects, the optional SPIS and its legal effect, and a buyer’s own inspection responsibility.

February 23, 2027
Real Estate

Can You Back Out of a Real Estate Deal in Ontario?

Covers why there’s generally no cooling-off period once an APS is firm, the deposit-forfeiture and damages consequences of backing out without a basis, and the narrow legitimate exits available.

February 24, 2027
Real Estate

Co-Ownership Agreements for Ontario Property

Explains joint tenancy versus tenancy in common, why a separate co-ownership agreement is needed beyond the deed, and partition and sale as a last-resort court remedy.

February 25, 2027
Real Estate

Rent-to-Own Agreements in Ontario: Risks and Red Flags

Explains the lease-plus-option structure behind rent-to-own deals, the risk of forfeiting rent and option credits, common red flags, and what to check before signing.

February 26, 2027

FAQ

Frequently asked questions

How is a new-build home purchase different from buying a resale home in Ontario?+

A new-build purchase generally uses the builder’s own agreement of purchase and sale form rather than the standard pre-printed form common in resale deals, and it typically includes provisions for a home that doesn’t exist yet — like construction timelines, occupancy dates, and upgrade selections. It also comes with Tarion new home warranty coverage, which a resale purchase generally doesn’t include.

What is Tarion and why does it matter when buying a new home?+

Tarion is the organization that administers Ontario’s new home warranty program under the Ontario New Home Warranties Plan Act. It matters because it provides a structured, defined set of protections for defects in a new home — covering certain deposit amounts and specific warranty periods — that exist independently of whatever the builder’s own contract says.

What does the Tarion warranty generally cover?+

Coverage is generally organized into time-based windows: a one-year warranty covering workmanship and materials and ensuring the home is fit for habitation, a two-year warranty covering items like water penetration and electrical, plumbing, and heating delivery systems, and a seven-year warranty covering major structural defects. Each window covers a different category of issue, and coverage for an item generally ends once its specific window closes.

What is not covered by the Tarion new home warranty?+

Normal wear and tear, damage caused by the homeowner, items affected by a lack of maintenance, and changes made by the homeowner after closing are generally excluded. Cosmetic or minor issues reported after the relevant reporting window has closed are also typically no longer eligible for a claim, even if they technically existed earlier.

How much is my deposit protected if I buy a new-build home in Ontario?+

Tarion generally provides deposit protection up to a statutory maximum for freehold and condominium purchases, which is designed to protect buyers if a builder becomes insolvent or otherwise fails to complete the home. The specific dollar limits are set by regulation and are worth confirming directly with Tarion, since they can be adjusted over time.

What happens if my new home’s closing date gets delayed?+

New-build agreements typically include their own delayed closing or occupancy provisions, often allowing the builder a certain number of permitted extensions before compensation is owed. Tarion’s warranty program also generally provides compensation for delays beyond what the contract and statutory rules permit, calculated under its own delayed closing/occupancy compensation rules.

Can I negotiate the terms of a builder’s agreement of purchase and sale?+

Builders generally use a standard form for all buyers in a project and are often less willing to negotiate core terms compared to a typical resale negotiation, though specific items like upgrade pricing, included features, or closing date ranges can sometimes be discussed. Reviewing the agreement, including the fine print on delays and adjustments, before signing is generally considered important given the limited room to negotiate afterward.

How do I make a claim under the Tarion warranty?+

Claims are generally made by submitting the relevant form to Tarion within the specific reporting period tied to the warranty window the issue falls under — commonly around the 30-day, year-end, and two-year marks, with a separate process for major structural issues within the seven-year window. Missing a reporting deadline for a particular item can mean losing warranty coverage for it even if the underlying defect is genuine.

What are common new-build closing adjustments I should expect?+

New-build closings commonly include adjustments that a resale closing typically doesn’t, such as development charges, utility connection fees, Tarion enrolment fees, and in some cases HST-related items depending on how the purchase price was structured. These adjustments are generally set out in the builder’s agreement, and reviewing that section closely helps avoid surprises at closing.

Does Tarion cover pre-construction condo deposits the same way as freehold homes?+

Tarion’s deposit protection generally applies to both freehold and condominium new-build purchases, though the statutory maximum amounts and some procedural details can differ between the two. Pre-construction condo purchases also often involve a longer period between the agreement and closing, which can bring additional considerations around interim occupancy and assignment.

Who do I contact first if I think my new home has a warranty issue?+

The builder is generally contacted first, since many issues are resolved directly without a formal claim. If the builder doesn’t respond or resolve the issue within the applicable period, the next step is generally submitting a formal warranty claim form to Tarion within that item’s reporting window.

Is there a limitation period for pursuing a construction defect claim outside of Tarion?+

Potentially, yes. Some defects or disputes with a builder may also raise ordinary contract or construction law issues separate from the Tarion warranty, and Ontario’s general limitation periods can apply to those claims. Because Tarion’s reporting windows and general limitation periods don’t always align, it’s worth understanding both rather than assuming one covers everything the other might.

Understand your agreement. Know your next step.

Ontario-wide, plain-English contract law information — built to help you make sense of your situation before you decide what to do next.

Free Consultation

Speak with a contract lawyer, free of charge

Tell us briefly what’s going on and we’ll be in touch to set up a free consultation about your contract situation.